Nissan Rogue (T33) 2021-Present Service Manual: P1c91-17 Sub Starter & Generator
DTC Description
DTC DETECTION LOGIC
| DTC No. | CONSULT screen terms (Trouble diagnosis content) | DTC detection condition | |
|---|---|---|---|
| P1C91-17 |
Sub starter & generator (Sub starter & generator) |
Diagnosis condition | Engine running at idle |
| Signal (terminal) | 12V battery voltage | ||
| Threshold | The voltage value transmitted via CAN communication from IPDM E/R and the battery voltage value measured by sub starter & generator are different of 0.8 V or more | ||
| Diagnosis delay time | 10 seconds or less | ||
POSSIBLE CAUSE
-
IPDM E/R
-
Sub starter & generator
-
CAN communication circuit
-
Harness or connectors (12V battery voltage circuits is open or short circuit)
FAIL-SAFE
Inhibit the idle start/stop system
DTC CONFIRMATION PROCEDURE
PERFORM DTC CONFIRMATION PROCEDURE
CONSULT
-
Start the engine and let it idle and wait for 1 second or more.
-
Select “Self diagnosis result� mode of “Sub starter & generator�.
Is DTC detected?
YES>>Refer to Diagnosis Procedure.
NO-1>>To check malfunction symptom before repair: Refer to Intermittent Incident.
NO-2>>Confirmation after repair: Inspection End.
Diagnosis Procedure
CHECK 12V BATTERY VOLTAGE
-
Ignition switch OFF.
-
Check the voltage between the 12V battery positive terminal and 12V battery negative terminal.
>>
GO TO 2.
CHECK FUSIBLE
-
Ignition switch OFF.
-
Check that the following fusible link is not blown (open):
Signal name Fusible No. Capacity 12V battery voltage 99 10 A
Is the fusible lnk blown (open)?
YES>>Replace the blown (open) fuse after repairing the affected circuit if a fuse is blown (open).
NO>>GO TO 3.
CHECK 12V BATTERY VOLTAGE SIGNAL
-
Disconnect sub starter & generator connector.
-
Check the voltage between the sub starter & generator harness connector and ground.
(+) (-) Voltage
(Approx.)Sub starter & generator Connector Terminal F126 3 Ground Battery voltage -
Check the continuity between the sub starter & generator harness connector and ground.
(+) (-) Continuity Sub starter & generator Connector Terminal F126 5 Ground Yes
Is the difference between the voltage value assumed in step 2 and the voltage value measured in step 4, 0.8 V or more?
YES>>Check power supply circuit.
NO>>GO TO 4.
CHECK 12V BATTERY VOLTAGE
CONSULT
-
Ignition switch ON.
-
Select “BATTERY VOLTAGE� of “IPDM E/R� data monitor item.
-
Check the value of “BATTERY VOLTAGE�.
Monitor item Value BATTERY VOLTAGE 11 – 14 V
Is the difference between the voltage value assumed in step 2 and the voltage value measured in step 5, 0.8 V or more?
YES>>GO TO 5.
NO>>Replace sub starter & generator. Refer to Removal and Installation.
CHECK POWER SUPPLY AND GROUND CIRCUIT OF IPDM E/R
Check power supply and ground circuit of IPDM E/R. Refer to Diagnosis Procedure
Is the inspection result normal?
YES>>Check intermittent incident. Refer to Intermittent Incident.
NO>>Replace IPDM E/R. Refer to Removal and Installation.
Other materials:
Dtc/circuit Diagnosis. Door Lock Actuator
Front Lh
Diagnosis Procedure
CHECK DOOR LOCK ACTUATOR INPUT SIGNAL
Ignition switch OFF.
Disconnect front door lock assembly LH connector.
Check voltage between front door lock assembly LH harness connector and ground.
(+) (–) Condition
Voltage
(Approx.)
Front door lock a ...
Keys
Intelligent Key
Type A (if so equipped)
Type B (if so equipped)
Type C (if so equipped)
Intelligent Key (2 sets)
Mechanical key (inside Intelligent Key) (2 sets)
Key number plate
Basic information
Your Nissan Rogue can be operated only with Intelligent Keys that are programmed to its I ...
Pre-Inspection for Diagnosis
Work Procedure
CHECK CAMERA LENS AND WINDSHIELD
Are camera lens and windshield contaminated with foreign materials?
YES (When the camera lens is contaminated with foreign materials.)>>
Replace front camera unit (Refer to Removal and Installation.) and GO TO 2.
YES (When the windshield ...