Nissan Rogue (T33) 2021-Present Service Manual: Ecv (electrical Control Valve)

Diagnosis Procedure

CHECK FUSE

  1. Ignition switch OFF.

  2. Check that the following fuse is not blown (open).

    Unit Location Fuse No. Capacity
    A/C compressor IPDM E/R 71 10 A

Is the fuse blown (open)?

YES>>

Replace the blown (open) fuse after repairing the affected circuit if a fuse is blown (open).

NO>>

GO TO 2.

CHECK ECV POWER SUPPLY CIRCUIT

  1. Disconnect A/C compressor connector.

  2. Ignition switch ON.

  3. Check voltage between A/C compressor harness connector and ground.

    (+) (−) Voltage
    A/C compressor
    Connector Terminal
    F15 3 Ground Battery voltage

Is the inspection result normal?

YES>>

GO TO 4.

NO>>

GO TO 3.

CHECK ECV POWER SUPPLY CIRCUIT FOR OPEN

  1. Ignition switch OFF.

  2. Disconnect IPDM E/R connector.

  3. Check continuity between A/C compressor harness connector and IPDM E/R harness connector.

    A/C compressor IPDM E/R Continuity
    Connector Terminal Connector Terminal
    F15 3 F35 71 Yes

Is the inspection result normal?

YES>>

Replace IPDM E/R. Refer to Removal and Installation.

NO>>

Repair harness or connector.

CHECK ECV CONTROL SIGNAL CIRCUIT FOR OPEN

  1. Ignition switch OFF.

  2. Disconnect IPDM E/R connector.

  3. Check continuity between A/C compressor harness connector and IPDM E/R harness connector.

    A/C compressor IPDM E/R Continuity
    Connector Terminal Connector Terminal
    F15 4 F42 98 Yes

Is the inspection result normal?

YES>>

GO TO 5.

NO>>

Repair harness or connector.

CHECK ECV

Check ECV. Refer to Component Inspection.

Is the inspection result normal?

YES>>

Replace IPDM E/R. Refer to Removal and Installation.

NO>>

Replace A/C compressor. Refer to Removal and Installation.

Component Inspection

CHECK ECV

  1. Ignition switch OFF.

  2. Check continuity between A/C compressor terminals.

Terminal Continuity
3 4 Yes

Is the inspection result normal?

YES>>

Inspection End.

NO>>

Replace A/C compressor. Refer to Removal and Installation.

    Magnetic Clutch
    Component Function Check CHECK MAGNETIC CLUTCH OPERATION CONSULT Select “HVAC TEST” in “Active test” mode of “HVAC”. Touch “MODE 1”. With operating the test item...
    Ptc Heater
    Component Function Check CHECK PTC HEATER OPERATION Start the engine. Operate front blower motor. Operate temperature control dial to full hot position. Check for warm air at di...

    Other materials:

    Basic Inspection. System Initialization
    Description Initialization of system should be conducted after the following conditions: Refer to Work Procedure. When the moonroof motor assembly or sunshade motor assembly is replaced. When the moonroof or sunshade does not operate normally. (Incomplete initialization conditions) Wor ...

    Nissanconnect. Basic Inspection
    Diagnosis and Repair Workflow Nissanconnect Work Flow OVERALL SEQUENCEDETAILED FLOWINTERVIEW FOR MALFUNCTION It is also important to clarify the customer concerns before starting the inspection. Interview the customer about the concerns carefully and understand the symptoms fully. NOTE: ...

    Dtc/circuit Diagnosis. B2046-42 Eeprom
    DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen items (Trouble diagnosis content) DTC Detection Condition B2046-42 EEPROM (Electrically Erasable Programmable Read-Only Memory) Diagnosis condition Ignition switch ON Signal (terminal) — Threshold EEPROM ...