Nissan Rogue (T33) 2021-Present Service Manual: Ptc Heater
Component Function Check
CHECK PTC HEATER OPERATION
-
Start the engine.
-
Operate front blower motor.
-
Operate temperature control dial to full hot position.
-
Check for warm air at discharge air outlet.
NOTE:
-
Engine must be cold.
-
Battery must be charged.
-
Is the inspection result normal?
YES>>Inspection End.
NO>>Refer to Diagnosis Procedure.
Diagnosis Procedure
CHECK FUSE AND FUSIBLE LINKS
-
Ignition switch OFF.
-
Check that the following fuse and fusible links are not blown (open).
Unit Location Fuse and fusible link No. Capacity PTC heater relay Fuse block (J/B) 9 10 A Fuse and fusible link box 3 104 30 A 105 106
Is the fuse and fusible links blown (open)?
YES>>Replace the blown (open) fuse and fusible links after repairing the affected circuit if a fuse and fusible links are blown (open).
NO>>GO TO 2.
CHECK PTC HEATER RELAY POWER SUPPLY
-
Remove PTC heater relay.
-
Ignition switch ON.
-
Check voltage between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and ground.
PTC heater relay 1 (+) (−) Voltage PTC heater relay 1 Connector Terminal E80 6 Ground Battery voltage 9 PTC heater relay 2 and PTC heater relay 3 Relay (+) (−) Voltage PTC heater relay 2 and PTC heater relay 3 Connector Terminal 2 E81 1 Ground Battery voltage 4 3 6 9
Is the inspection result normal?
YES>>GO TO 3.
NO>>Repair the PTC heater relay power supply circuit.
CHECK PTC HEATER RELAY CONTROL SIGNAL CIRCUIT FOR OPEN
-
Ignition switch OFF.
-
Disconnect BCM connector.
-
Check continuity between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and BCM harness connector.
PTC heater relay 1 PTC heater relay 1 BCM Continuity Connector Terminal Connector Terminal E80 8 With type A meter: E60 118 Yes With type B meter: E29 125 PTC heater relay 2 and PTC heater relay 3 PTC heater relay 2 and PTC heater relay 3 BCM Continuity Relay Connector Terminal Connector Terminal 2 E81 3 With type A meter: E60 117 Yes With type B meter: E29 127 3 8 With type A meter: E60 121 With type B meter: E29 126
Is the inspection result normal?
YES>>GO TO 4.
NO>>Repair harness or connector.
CHECK PTC HEATER POWER SUPPLY CIRCUIT FOR OPEN
Check continuity between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and PTC heater harness connector.
| PTC heater relay 1 | PTC heater | Continuity | ||
|---|---|---|---|---|
| Connector | Terminal | Connector | Terminal | |
| E80 | 7 | E77 | 3 | Yes |
| PTC heater relay 2 and PTC heater relay 3 | PTC heater | Continuity | |||
|---|---|---|---|---|---|
| Relay | Connector | Terminal | Connector | Terminal | |
| 2 | E81 | 2 | E77 | 4 | Yes |
| 3 | 7 | 5 | |||
Is the inspection result normal?
YES>>GO TO 5.
NO>>Repair harness or connector.
CHECK PTC HEATER GROUND CIRCUIT FOR OPEN
Check continuity between PTC heater harness connector and ground.
| PTC heater | (—) | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| E78 | 1 | Ground | Yes |
| 2 | |||
Is the inspection result normal?
YES>>GO TO 6.
NO>>Repair harness or connector.
CHECK PTC HEATER RELAY
Check PTC heater relay. Refer to Component Inspection (PTC Heater Relay).
Is the inspection result normal?
YES>>GO TO 7.
NO>>Replace malfunctioning PTC heater relay.
CHECK PTC HEATER
Check PTC heater. Refer to Component Inspection (PTC Heater).
Is the inspection result normal?
YES>>Replace BCM. Refer to Removal and Installation.
NO>>Replace PTC heater. Refer to Removal and Installation.
Component Inspection (PTC Heater Relay)
CHECK PTC HEATER RELAY
-
Ignition switch OFF.
-
Disconnect PTC heater relay connector.
-
Check continuity between PTC heater relay 1 terminals 6 and 7 when the voltage is supplied between terminals 8 and 9.
PTC heater relay 1 Condition Continuity Terminal 6 7 Battery voltage Apply Yes Not apply No -
Check continuity between PTC heater relay 2 terminals 1 and 2 when the voltage is supplied between terminals 3 and 4.
PTC heater relay 2 Condition Continuity Terminal 1 2 Battery voltage Apply Yes Not apply No -
Check continuity between PTC heater relay 3 terminals 6 and 7 when the voltage is supplied between terminals 8 and 9.
PTC heater relay 3 Condition Continuity Terminal 6 7 Battery voltage Apply Yes Not apply No
Is the inspection result normal?
YES>>Inspection End.
NO>>Replace malfunctioning PTC heater relay.
Component Inspection (PTC Heater)
CHECK PTC HEATER
-
Ignition switch OFF.
-
Check resistance between PTC heater terminals.
| Terminal | Resistance (Ω) | |
|---|---|---|
| 3 | 1 | Except 0 or ∞ |
| 4 | 1 and 2 | |
| 5 | 2 | |
Is the inspection result normal?
YES>>Inspection End.
NO>>Replace PTC heater. Refer to Removal and Installation.
Other materials:
Dtc/circuit Diagnosis. B2081-23 Request Sw (fl)
DTC Description
DTC DETECTION LOGIC DTC No.
CONSULT screen items
(Trouble diagnosis content) DTC Detection Condition
B2081-23
Request SW (FL)
[Request switch (front left side)]
Diagnosis condition
Ignition switch ON
Signal (terminal)
Door request switch signal (Intelligent ...
P2237 Ho2s2
DTC Description
To judge malfunctions, the diagnosis checks that the A/F signal
computed by ECM from the A/F sensor 1 signal fluctuates according to
fuel feedback control.DTC DETECTION LOGIC DTC
CONSULT screen terms
(Trouble diagnosis content)
DTC detection condition
P2237
00
...
Dtc/circuit Diagnosis. U2152-57 Can Comm Err (adas Control Unit)
DTC Description
DTC DETECTION LOGIC DTC No.
CONSULT screen items
(Trouble diagnosis content) DTC Detection Condition
U2152-57
CAN comm err (ADAS control unit)
[Control area network communication error (ADAS control unit)]
Diagnosis condition
-
Signal (terminal)
-
Thre ...
