Nissan Rogue (T33) 2021-Present Service Manual: Dtc/circuit Diagnosis :: Power Supply and Ground Circuit
Diagnosis Procedure
CHECK ELECTRICALLY-DRIVEN INTELLIGENT BRAKE UNIT Ignition switch ON POWER SUPPLY
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Get out of the Nissan Ariya vehicle, close all doors (other than hood assembly), check that the combination meter is OFF, and wait for 1 minute or more without opening these doors.
CAUTION:
Never operate the Nissan Ariya vehicle.
-
Disconnect 12V battery cable from negative terminal.
-
Disconnect the Electrically-driven Intelligent Brake Unit harness connector.
-
Connect 12V battery cable to negative terminal.
-
Check the voltage between the Electrically-driven Intelligent Brake Unit harness connector and ground.
+ — Voltage Electrically-driven Intelligent Brake Unit Connector Terminal E61 20 Ground Approx. 0 V -
Ignition switch ON without depressing the brake pedal.
-
Check the voltage between the Electrically-driven Intelligent Brake Unit harness connector and ground.
+ — Voltage Electrically-driven Intelligent Brake Unit Connector Terminal E61 20 Ground 10 − 16 V
Is the inspection result normal?
YES>>GO TO 3.
NO>>GO TO 2.
CHECK ELECTRICALLY-DRIVEN INTELLIGENT BRAKE UNIT Ignition switch ON POWER SUPPLY CIRCUIT
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Get out of the Nissan Ariya vehicle, close all doors (other than hood assembly), check that the combination meter is OFF, and wait for 1 minute or more without opening these doors.
CAUTION:
Never operate the Nissan Ariya vehicle.
-
Disconnect 12V battery cable from negative terminal.
-
Check the 10A fuse (#55).
-
Disconnect fuse block (F/B) harness connector.
-
Check the continuity between Electrically-driven Intelligent Brake Unit harness connector and fuse block (J/B) harness connector.
Electrically-driven Intelligent Brake Unit Fuse block (F/B) Continuity Connector Terminal Connector Terminal E61 20 E28 11J Existed -
Check the continuity between Electrically-driven Intelligent Brake Unit harness connector and ground.
Electrically-driven Intelligent Brake Unit — Continuity Connector Terminal B63 20 Ground Not existed
Is the inspection result normal?
YES>>Perform trouble diagnosis for Ignition switch ON power supply.
NO>>Repair / replace harness, connector, or fuse.
CHECK ELECTRICALLY-DRIVEN INTELLIGENT BRAKE UNIT MOTOR POWER SUPPLY
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Connect 12V battery cable to negative terminal.
-
Check the voltage between the Electrically-driven Intelligent Brake Unit harness connector and ground.
Electrically-driven Intelligent Brake Unit Voltage Connector Terminal + - E61 1 9 10 - 16 V -
Ignition switch ON without depressing the brake pedal.
-
Check the voltage between the Electrically-driven Intelligent Brake Unit harness connector and ground.
Electrically-driven Intelligent Brake Unit Voltage Connector Terminal + - E61 1 9 10 - 16 V
Is the inspection result normal?
YES>>GO TO 5.
NO>>GO TO 4.
CHECK ELECTRICALLY-DRIVEN INTELLIGENT BRAKE UNIT MOTOR POWER SUPPLY CIRCUIT
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Get out of the Nissan Ariya vehicle, close all doors (other than hood assembly), check that the combination meter is OFF, and wait for 1 minute or more without opening these doors.
CAUTION:
Never operate the Nissan Ariya vehicle.
-
Disconnect 12V battery cable from negative terminal.
-
Check the 30A fusible link (#O).
-
Check the continuity and for short circuit between harness connector terminal 1 of Electrically-driven Intelligent Brake Unit and 30A fusible link (#O).
Is the inspection result normal?
YES>>Perform trouble diagnosis for 12V battery power supply.
NO>>Repair / replace harness, connector, fuse, or fusible link.
CHECK BRAKE POWER SUPPLY BACKUP UNIT 12V BATTERY POWER SUPPLY
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Get out of the Nissan Ariya vehicle, close all doors (other than hood assembly), check that the combination meter is OFF, and wait for 1 minute or more without opening these doors.
CAUTION:
Never operate the Nissan Ariya vehicle.
-
Disconnect 12V battery cable from negative terminal.
-
Disconnect brake power supply backup unit harness connector.
-
Connect 12V battery cable to negative terminal.
-
Check the voltage between brake power supply backup unit harness connector and ground.
+ — Voltage Brake power supply backup unit Connector Terminal B120 6 Ground 10 − 16 V -
Ignition switch ON without depressing the brake pedal.
-
Check the voltage between brake power supply backup unit harness connector and ground.
+ — Voltage Brake power supply backup unit Connector Terminal B120 6 Ground 10 − 16 V
Is the inspection result normal?
YES>>GO TO 7.
NO>>GO TO 6.
CHECK BRAKE POWER SUPPLY BACKUP UNIT 12V BATTERY POWER SUPPLY CIRCUIT
-
Ignition switch OFF and disconnect CONSULT from data link connector.
-
Get out of the Nissan Ariya vehicle, close all doors (other than hood assembly), check that the combination meter is OFF, and wait for 1 minute or more without opening these doors.
CAUTION:
Never operate the Nissan Ariya vehicle.
-
Disconnect 12V battery cable from negative terminal.
-
Check the 10A fusible link (#55).
-
Check the continuity and for short circuit between harness connector terminal 6 of brake power supply backup unit and 10A fusible link (#55).
Is the inspection result normal?
YES>>Perform trouble diagnosis for 12V battery power supply.
NO>>Repair / replace harness, connector, or fusible link.
CHECK ELECTRICALLY-DRIVEN INTELLIGENT BRAKE UNIT GROUND
Check the continuity between Electrically-driven Intelligent Brake Unit harness connector and ground.
| Electrically-driven Intelligent Brake Unit | — | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| E61 | 9 | Ground | Existed |
Is the inspection result normal?
YES>>GO TO 8.
NO>>Repair / replace harness or connector.
CHECK BRAKE POWER SUPPLY BACKUP UNIT GROUND
Check the continuity between brake power supply backup unit harness connector and ground.
| Brake power supply backup unit | — | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| B120 | 2 | Ground | Existed |
Is the inspection result normal?
YES>>GO TO 9.
NO>>Repair / replace harness or connector.
CHECK TERMINAL
-
Check Electrically-driven Intelligent Brake Unit terminals for damage or loose connection with harness connector.
-
Check fuse block (J/B) terminals for damage or loose connection with harness connector.
-
Check brake power supply backup unit terminals for damage or loose connection with harness connector.
Is the inspection result normal?
YES>>Inspection End.
NO>>Repair / replace harness, connector, or terminal.
Other materials:
Dtc/circuit Diagnosis. C18de-82 Brake Power Supply Back up Unit
DTC Description
DTC DETECTION LOGIC DTC No. CONSULT screen terms DTC detection condition
C18DE
82
Backup power supply unit communication
Diagnosis condition
When Ignition switch is ON.
Signal (terminal)
Brake power supply backup unit signal
Threshold
When a malfunct ...
P0106 Manifold Absolute Pressure Sensor
DTC Description
DTC DETECTION LOGIC DTC
CONSULT screen terms
(Trouble diagnosis content)
DTC detection condition
P0106
00
ABSL PRES SEN/CIRC
(Manifold Absolute Pressure/Barometric Pressure Sensor Circuit Range/Performance)
Diagnosis condition
—
Signal (terminal)
...
Automatic air conditioner (models without rear control)
Models with heated steering wheel
Models without heated steering wheel
Basic information
Temperature control dial (driver's side)
AUTO button
Display screen
SYNC button
Temperature control dial (passenger's side)
ON·OFF button
Air recirculation button
Fan speed buttons
Air flow ...