Nissan Rogue (T33) 2021-Present Service Manual: Ptc Heater
Component Function Check
CHECK PTC HEATER OPERATION
-
Start the engine.
-
Operate front blower motor.
-
Operate temperature control dial to full hot position.
-
Check for warm air at discharge air outlet.
NOTE:
-
Engine must be cold.
-
Battery must be charged.
-
Is the inspection result normal?
YES>>Inspection End.
NO>>Refer to Diagnosis Procedure.
Diagnosis Procedure
CHECK FUSE AND FUSIBLE LINKS
-
Ignition switch OFF.
-
Check that the following fuse and fusible links are not blown (open).
Unit Location Fuse and fusible link No. Capacity PTC heater relay Fuse block (J/B) 9 10 A Fuse and fusible link box 3 104 30 A 105 106
Is the fuse and fusible links blown (open)?
YES>>Replace the blown (open) fuse and fusible links after repairing the affected circuit if a fuse and fusible links are blown (open).
NO>>GO TO 2.
CHECK PTC HEATER RELAY POWER SUPPLY
-
Remove PTC heater relay.
-
Ignition switch ON.
-
Check voltage between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and ground.
PTC heater relay 1 (+) (−) Voltage PTC heater relay 1 Connector Terminal E80 6 Ground Battery voltage 9 PTC heater relay 2 and PTC heater relay 3 Relay (+) (−) Voltage PTC heater relay 2 and PTC heater relay 3 Connector Terminal 2 E81 1 Ground Battery voltage 4 3 6 9
Is the inspection result normal?
YES>>GO TO 3.
NO>>Repair the PTC heater relay power supply circuit.
CHECK PTC HEATER RELAY CONTROL SIGNAL CIRCUIT FOR OPEN
-
Ignition switch OFF.
-
Disconnect BCM connector.
-
Check continuity between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and BCM harness connector.
PTC heater relay 1 PTC heater relay 1 BCM Continuity Connector Terminal Connector Terminal E80 8 With type A meter: E60 118 Yes With type B meter: E29 125 PTC heater relay 2 and PTC heater relay 3 PTC heater relay 2 and PTC heater relay 3 BCM Continuity Relay Connector Terminal Connector Terminal 2 E81 3 With type A meter: E60 117 Yes With type B meter: E29 127 3 8 With type A meter: E60 121 With type B meter: E29 126
Is the inspection result normal?
YES>>GO TO 4.
NO>>Repair harness or connector.
CHECK PTC HEATER POWER SUPPLY CIRCUIT FOR OPEN
Check continuity between PTC heater relay 1, PTC heater relay 2, and PTC heater relay 3 harness connector and PTC heater harness connector.
| PTC heater relay 1 | PTC heater | Continuity | ||
|---|---|---|---|---|
| Connector | Terminal | Connector | Terminal | |
| E80 | 7 | E77 | 3 | Yes |
| PTC heater relay 2 and PTC heater relay 3 | PTC heater | Continuity | |||
|---|---|---|---|---|---|
| Relay | Connector | Terminal | Connector | Terminal | |
| 2 | E81 | 2 | E77 | 4 | Yes |
| 3 | 7 | 5 | |||
Is the inspection result normal?
YES>>GO TO 5.
NO>>Repair harness or connector.
CHECK PTC HEATER GROUND CIRCUIT FOR OPEN
Check continuity between PTC heater harness connector and ground.
| PTC heater | (–) | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| E78 | 1 | Ground | Yes |
| 2 | |||
Is the inspection result normal?
YES>>GO TO 6.
NO>>Repair harness or connector.
CHECK PTC HEATER RELAY
Check PTC heater relay. Refer to Component Inspection (PTC Heater Relay).
Is the inspection result normal?
YES>>GO TO 7.
NO>>Replace malfunctioning PTC heater relay.
CHECK PTC HEATER
Check PTC heater. Refer to Component Inspection (PTC Heater).
Is the inspection result normal?
YES>>Replace BCM. Refer to Removal and Installation.
NO>>Replace PTC heater. Refer to Removal and Installation.
Component Inspection (PTC Heater Relay)
CHECK PTC HEATER RELAY
-
Ignition switch OFF.
-
Disconnect PTC heater relay connector.
-
Check continuity between PTC heater relay 1 terminals 6 and 7 when the voltage is supplied between terminals 8 and 9.
PTC heater relay 1 Condition Continuity Terminal 6 7 Battery voltage Apply Yes Not apply No -
Check continuity between PTC heater relay 2 terminals 1 and 2 when the voltage is supplied between terminals 3 and 4.
PTC heater relay 2 Condition Continuity Terminal 1 2 Battery voltage Apply Yes Not apply No -
Check continuity between PTC heater relay 3 terminals 6 and 7 when the voltage is supplied between terminals 8 and 9.
PTC heater relay 3 Condition Continuity Terminal 6 7 Battery voltage Apply Yes Not apply No
Is the inspection result normal?
YES>>Inspection End.
NO>>Replace malfunctioning PTC heater relay.
Component Inspection (PTC Heater)
CHECK PTC HEATER
-
Ignition switch OFF.
-
Check resistance between PTC heater terminals.
| Terminal | Resistance (Ω) | |
|---|---|---|
| 3 | 1 | Except 0 or ∞ |
| 4 | 1 and 2 | |
| 5 | 2 | |
Is the inspection result normal?
YES>>Inspection End.
NO>>Replace PTC heater. Refer to Removal and Installation.
Other materials:
Cvt: Ge0f14a. Symptom Diagnosis
Cvt Control System
Symptom Table
The diagnosis item number indicates the order of check. Start checking in the order from 1.
Perform diagnoses of symptom table 1 before symptom table 2.
Symptom Table 1 Diagnostic item Reference Symptom
Shift Shock Slips/Will Not Engage Other
...
Symptom Diagnosis. Easy Fill Tire Alert Does Not Activate
Description
The easy fill tire alert does not function while inflating a tire
when the CVT shift selector position is in P-range with the ignition
switch ON or with the engine started.NOTE:
After starting to inflate the tire, it takes a few seconds for the easy fill tire alert to function. ...
Repair Information. Preparation
Repairing Material
Foam Repair
During factory body assembly, foam insulators are installed in
certain body panels and locations around the Nissan Ariya vehicle. Use
the following procedure(s) to replace any factory-installed foam
insulators.URETHANE FOAM APPLICATIONSUse commercially availabl ...
