Nissan Rogue (T33) 2021-Present Service Manual: Ecv (electrical Control Valve)

Diagnosis Procedure

CHECK FUSE

  1. Ignition switch OFF.

  2. Check that the following fuse is not blown (open).

    Unit Location Fuse No. Capacity
    A/C compressor IPDM E/R 71 10 A

Is the fuse blown (open)?

YES>>

Replace the blown (open) fuse after repairing the affected circuit if a fuse is blown (open).

NO>>

GO TO 2.

CHECK ECV POWER SUPPLY CIRCUIT

  1. Disconnect A/C compressor connector.

  2. Ignition switch ON.

  3. Check voltage between A/C compressor harness connector and ground.

    (+) (−) Voltage
    A/C compressor
    Connector Terminal
    F15 3 Ground Battery voltage

Is the inspection result normal?

YES>>

GO TO 4.

NO>>

GO TO 3.

CHECK ECV POWER SUPPLY CIRCUIT FOR OPEN

  1. Ignition switch OFF.

  2. Disconnect IPDM E/R connector.

  3. Check continuity between A/C compressor harness connector and IPDM E/R harness connector.

    A/C compressor IPDM E/R Continuity
    Connector Terminal Connector Terminal
    F15 3 F35 71 Yes

Is the inspection result normal?

YES>>

Replace IPDM E/R. Refer to Removal and Installation.

NO>>

Repair harness or connector.

CHECK ECV CONTROL SIGNAL CIRCUIT FOR OPEN

  1. Ignition switch OFF.

  2. Disconnect IPDM E/R connector.

  3. Check continuity between A/C compressor harness connector and IPDM E/R harness connector.

    A/C compressor IPDM E/R Continuity
    Connector Terminal Connector Terminal
    F15 4 F42 98 Yes

Is the inspection result normal?

YES>>

GO TO 5.

NO>>

Repair harness or connector.

CHECK ECV

Check ECV. Refer to Component Inspection.

Is the inspection result normal?

YES>>

Replace IPDM E/R. Refer to Removal and Installation.

NO>>

Replace A/C compressor. Refer to Removal and Installation.

Component Inspection

CHECK ECV

  1. Ignition switch OFF.

  2. Check continuity between A/C compressor terminals.

Terminal Continuity
3 4 Yes

Is the inspection result normal?

YES>>

Inspection End.

NO>>

Replace A/C compressor. Refer to Removal and Installation.

    Magnetic Clutch
    Component Function Check CHECK MAGNETIC CLUTCH OPERATION CONSULT Select “HVAC TEST� in “Active test� mode of “HVAC�. Touch “MODE 1�. With operating the test item...
    Ptc Heater
    Component Function Check CHECK PTC HEATER OPERATION Start the engine. Operate front blower motor. Operate temperature control dial to full hot position. Check for warm air at di...

    Other materials:

    Main Line Between Hvac and a-Bag Circuit
    Diagnosis Procedure CHECK HARNESS CONTINUITY (OPEN CIRCUIT) Turn the ignition switch OFF. Disconnect the battery cable from the negative terminal. Disconnect the following harness connectors. A/C amp. Harness connectors M31 and E152 Check the continuity between the ...

    Charge Air Cooler
    Exploded View Charge air cooler Charge air cooler Bracket 1 Turbocharger boost sensor (with intake air temperature sensor 2) O-ring Electronic throttle control actuator gasket Charge air cooler Bracket 2 Air inlet hose         To r ...

    Ecu Diagnosis Information. Moonroof Motor Assembly
    Reference Value TERMINAL LAYOUTPHYSICAL VALUES Terminal No. (Wire color) Description Condition Value (Approx.) + – Signal name Input/Output 1 (B) Ground Ground — — 0 V 4 (W) Ground Moonroof Tilt UP signal Input Moonroof switch Operate ( ...