Nissan Rogue manuals

Nissan Rogue Service Manual: Parking brake switch signal circuit

Component Function Check

1.CHECK PARKING BRAKE SWITCH OPERATION

Check that brake warning lamp in combination meter turns ON/OFF when parking brake is actuated.

Is the inspection result normal? YES >> Inspection End.

NO >> Proceed to diagnosis procedure. Refer to WCS-45, "Diagnosis Procedure".

Diagnosis Procedure

Regarding Wiring Diagram information, refer to WCS-29, "Wiring Diagram".

1.CONNECTOR INSPECTION

  1.  Turn ignition switch OFF.
  2.  Disconnect combination meter and parking brake switch connectors.
  3.  Check connectors and terminals for deformation, disconnection, looseness or damage.

Is the inspection result normal? YES >> GO TO 2.

NO >> Repair or replace as necessary.

2.CHECK PARKING BRAKE SWITCH

Check parking brake switch. Refer to WCS-46, "Component Inspection".

Is the inspection result normal? YES >> GO TO 3.

NO >> Replace parking brake switch. Refer to PB-7, "Exploded View".

3.CHECK PARKING BRAKE SWITCH SIGNAL

With CONSULT.

  1.  Connect combination meter connector and parking brake switch connectors.
  2.  Turn ignition switch ON.
  3.  In DATA MONITOR select "PKB SW" and check parking brake switch signal.

Check parking brake switch signal

Is the inspection result normal? YES >> Refer to WCS-37, "Work Flow".

NO >> GO TO 4.

4.CHECK PARKING BRAKE SWITCH CIRCUIT

  1.  Turn ignition switch OFF.
  2.  Disconnect combination meter and parking brake switch connectors.
  3.  Check continuity between combination meter connector M76 terminal 26 and parking brake switch connector E52 terminal 1.

Check parking brake switch circuit

  1. Check continuity between combination meter connector and ground.

Check parking brake switch circuit

Is the inspection result normal? YES >> Replace combination meter. Refer to MWI-82, "Removal and Installation".

NO >> Repair or replace malfunctioning components.

Component Inspection

1.CHECK PARKING BRAKE SWITCH

  1.  Turn ignition switch OFF.
  2.  Disconnect parking brake switch connector.
  3.  Check continuity between parking brake switch terminal 1 and ground.

Check parking brake switch

Is the inspection result normal? YES >> Inspection End.

NO >> Replace parking brake switch. Refer to PB-7, "Exploded View".

Seat belt buckle switch signal circuit
Description Transmits a seat belt buckle switch signal to the combination meter. Component Function Check 1. CHECK COMBINATION METER INPUT SIGNAL  Ignition ON.  Monitor seat belt wa ...

Key switch signal circuit (without intelligent key)
Description Transmits a key switch signal to the BCM. Component Function Check 1. CHECK BCM INPUT SIGNAL Select "Data Monitor" for "BCM" and check the "KEY ON SW" mon ...

Other materials:

P0127 IAT sensor
DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen terms (Trouble diagnosis content) DTC detecting condition P0127 IAT SENSOR-B1 (Intake air temperature too high) Rationally incorrect voltage from the sensor is sent to ECM, compared with the voltage ...

Towing load/specification
TOWING LOAD/SPECIFICATION CHART     U.S. and Canada Maximum Towing Capacity*1 1,100lb. (500 kg) Maximum Tongue Load 110 lb. (50 kg) Maximum Gross Combined Weight Rating 5,291 lb. (2,400 kg) *1: The towing capacity ...

System description
COMPONENT PARTS Component Parts Location Air bag diagnosis sensor unit AV control unit Around view monitor control unit Chassis control module ABS actuator and electric unit (control unit)  â€¢ A/C auto amp. (With auto A/C) • Front air control (Without auto A/ C) ...

© 2014-2025 Copyright www.nirogue.com