Nissan Rogue (T33) 2021-Present Service Manual: Basic Inspection :: Additional Service When Replacing Ecm

Description

Performing the following procedure can automatically activate recommunication of ECM and Intelligent Key unit, but only when the ECM is replaced with a new one*. For details, refer to Work Procedure.

*: New one means a virgin ECM that has never been energized on-board.

(In this step, initialization procedure using CONSULT is not necessary)

CAUTION:

When replacing the ECM, always replace it with a new one.

The functions controlled by the ECM does not operate properly in case of reuse of the ECM from another Nissan Ariya vehicle.

NOTE:

  • When the replaced ECM is not a brand new, the specified procedure (Initialization of Intelligent Key unit and registration of Intelligent Keys) using CONSULT is necessary.

  • If multiple keys are attached to the key holder, separate them before beginning work.

  • Distinguish keys with unregistered key IDs from those with registered IDs.

Work Procedure

PERFORM ECM RECOMMUNICATING FUNCTION

  1. Install ECM.

  2. Contact backside of the registered Intelligent Key* to push-button ignition switch while brake pedal is depressed, then place ignition switch ON.

    *: To perform this step, use the key that is used before performing ECM replacement.

  3. Maintain ignition switch in the ON position for at least 5 seconds.

  4. Ignition switch OFF.

  5. Check that the engine starts.

>>

GO TO 2.

PERFORM ADDITIONAL SERVICE WHEN REPLACING ECM

Refer to Description Description.

>>

End.

    Basic Inspection. Diagnosis and Repair Work Flow
    Work Flow OVERALL SEQUENCEDETAILED FLOWGET INFORMATION FOR SYMPTOM Get detailed information from the customer about the symptom (the condition and the environment when the incid...
    Dtc/circuit Diagnosis. P161d-00 Immobilizer
    DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen items (Trouble diagnosis content) DTC detecting condition P161D-00 IMMOBILIZER (Immobilizer) Diagnosis condition Ignit...

    Other materials:

    Rear View Monitor. Preparation. Preparation
    Preparation Commercial Service Tools Tool Description Power tool Loosening screws ...

    Main Line Between Pwbd and M&a Circuit
    Diagnosis Procedure CHECK CONNECTOR Turn the ignition switch OFF. Disconnect the battery cable from the negative terminal. Check the following terminals and connectors for damage, bend and loose connection (connector side and harness side). Harness connector B41 Harness con ...

    Drive Pinion
    Exploded View Companion flange lock nut Companion flange Electro-hydraulic coupling oil seal Electro-hydraulic coupling assembly O-ring Actuator assembly O-ring Drive pinion oil seal Drive pinion lock nut Pinion front bearing Gasket Dr ...