Nissan Rogue manuals

Nissan Rogue Service Manual: Power supply and ground circuit

COMBINATION METER

COMBINATION METER : Diagnosis Procedure

Regarding Wiring Diagram information, refer to MWI-32, "Wiring Diagram".

1.CHECK FUSES

Check that the following fuses are not blown.

Check fuses

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2.POWER SUPPLY CIRCUIT CHECK

  1.  Disconnect combination meter connector.
  2.  Check voltage between combination meter harness connector M77 terminals 45, 46 and ground.

Power supply circuit check

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.GROUND CIRCUIT CHECK

  1.  Turn ignition switch OFF.
  2.  Check continuity between combination meter harness connector and ground.

Ground circuit check

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connector.

BCM (BODY CONTROL SYSTEM) (WITH INTELLIGENT KEY SYSTEM)

BCM (BODY CONTROL SYSTEM) (WITH INTELLIGENT KEY SYSTEM) : Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS-50, "Wiring Diagram".

1. CHECK FUSE

Check that the following fuse is not blown.

Check fuse

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2. CHECK POWER SUPPLY CIRCUIT

  1.  Disconnect BCM connector M20.
  2.  Check voltage between BCM connector M20 and ground.

Check power supply circuit

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connectors.

3. CHECK GROUND CIRCUIT

Check continuity between BCM connector M20 and ground.

Check ground circuit

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connectors.

BCM (BODY CONTROL SYSTEM) (WITHOUT INTELLIGENT KEY SYSTEM)

BCM (BODY CONTROL SYSTEM) (WITHOUT INTELLIGENT KEY SYSTEM) : Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS-110, "Wiring Diagram".

1. CHECK FUSE

Check that the following fuse is not blown.

Check fuse

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2. CHECK POWER SUPPLY CIRCUIT

  1.  Disconnect BCM connector M20.
  2. Check voltage between BCM connector M20 and ground.

Check power supply circuit

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connectors.

3. CHECK GROUND CIRCUIT

Check continuity between BCM connector M20 and ground.

Check ground circuit

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connectors.

B2268 water temp
Description The engine coolant temperature signal is transmitted from ECM to the combination meter via CAN communication. DTC Logic DTC DETECTION LOGIC DTC CONSULT Detec ...

Fuel level sensor signal circuit
Component Function Check 1.COMBINATION METER INPUT SIGNAL  Select "METER/M&A" on "CONSULT".  Using "FUEL METER" of "Data Monitor", compare ...

Other materials:

C1115 ABS sensor [abnormal signal]
DTC Logic DTC DETECTION LOGIC DTC Display Item Malfunction detected condition Possible causes C1115 ABS SENSOR [ABNORMAL SIGNAL] When difference in wheel speed between any wheel and others is detected while the vehicle is driven because of installation of ti ...

Cooling fan
Component Function Check 1.CHECK COOLING FAN FUNCTION With CONSULT  Turn ignition switch ON.  Perform “COOLING FAN (DUAL)” in “ACTIVE TEST” mode of “IPDM E/R” using CONSULT.  Touch “LOW”, “HI” on the CONSULT screen.  Check that cooling fan opera ...

P2096, P2097 A/F sensor 1
DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen terms (Trouble diagnosis content) DTC detecting condition P2096 POST CATALYST FUEL TRIM SYS B1 (Post catalyst fuel trim system too lean bank 1) The output voltage computed by ECM from the A/F sensor 1 s ...

© 2014-2023 Copyright www.nirogue.com