Nissan Rogue (T33) 2021-Present Service Manual: P14a6 Charge Air Cooler Cooling Electric Water Pump
DTC Description
DTC DETECTION LOGIC
| DTC |
CONSULT screen terms (Trouble diagnosis content) |
DTC detection condition | |
| P14A6 |
Charge air cooler cooling electric W/P (Charge air cooler cooling electric water pump) |
Diagnosis condition |
|
| Signal (terminal) | Charge air cooler (CAC) cooling electric water pump 1 command signal | ||
| Threshold |
|
||
| Diagnosis delay time | 10 seconds or more | ||
POSSIBLE CAUSE
-
Harness and connectors [Charge air cooler electric water pump command circuit is open or shorted.]
-
Charge air cooler electric water pump
FAIL-SAFE
Not applicable
DTC CONFIRMATION PROCEDURE
PRECONDITIONING
NOTE:
When DTC Confirmation Procedure has been preciously conducted, always perform the following before conducting the next test.
-
Turn ignition switch OFF and wait at least 10 seconds.
-
Turn ignition switch ON.
-
Turn ignition switch OFF and wait at least 10 seconds.
>>
GO TO 2.
PERFORM DTC CONFIRMATION PROCEDURE
NOTE:
Before performing this procedure, check that the battery voltage is more than 11 V during ignition switch ON.
-
Start the engine and warm it up to the normal operating temperature.
-
Wait at least 20 seconds.
-
Check 1st trip DTC.
Is DTC P14A6 detected?
YES>>Proceed to DTC Diagnosis Procedure.
NO-1>>To check malfunction symptom before repair: Refer to Intermittent Incident.
NO-2>>Confirmation after repair: INSPECTION END
DTC Diagnosis Procedure
COMPONENT FUNCTION CHECK
With CONSULT
-
Start the engine.
-
On CONSULT screen, select “ENGINE�>>“Active Test�>>“Charge air cooler cooling electric water pump�.
-
Check the value of charge air cooler electric water pump duty under the following conditions:
Item Condition Value -
Charge air cooler electric water pump
Normal mode 20 – 80 -
Is the inspection result normal?
YES>>INSPECTION END
NO>>GO TO 2.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP HARNESS CONNECTOR INSTALLATION
Check charge air cooler electric water pump harness connector installation condition visually and tectually.
Is the inspection result normal?
YES>>GO TO 3.
NO>>Repair or replace error-detected parts.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY-I
-
Turn ignition switch OFF.
-
Disconnect charge air cooler electric water pump harness connector.
-
Turn ignition switch ON.
-
Check the voltage between charge air cooler electric water pump harness connector and ground.
+ − Voltage Charge air cooler electric water pump Connector Terminal E36 2 Ground Battery voltage
Is the inspection result normal?
YES>>GO TO 11.
NO>>GO TO 4.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY-II
-
Turn ignition switch OFF.
-
Disconnect electric water pump relay and electric purge pump relay harness connector.
-
Turn ignition switch ON.
-
Check the voltage between electric water pump relay and electric purge pump relay harness connector and ground.
+ − Voltage electric water pump relay and electric purge pump relay Connector Terminal F103 9 Ground Battery voltage
Is the inspection result normal?
YES>>GO TO 6.
NO>>GO TO 5.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY CIRCUIT-I
-
Turn ignition switch OFF.
-
Disconnect IPDM E/R harness connector.
-
Check the continuity between IPDM E/R harness connector and electric water pump relay and electric purge pump relay harness connector.
IPDM E/R Electric water pump relay and electric purge pump relay Continuity Connector Terminal Connector Terminal F35 66 F103 9 Existed -
Also check harness for short to power and short to ground.
Is the inspection result normal?
YES>>INSPECTION END
NO>>Repair or replace error-detected parts.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY-III
-
Turn ignition switch OFF.
-
Check the voltage between electric water pump relay and electric purge pump relay harness connector and ground.
+ − Voltage Electric water pump relay and electric purge pump relay Connector Terminal F103 7 Ground Battery voltage
Is the inspection result normal?
YES>>GO TO 8.
NO>>GO TO 7.
CHECK FUSE
-
Pull out 15A fuse (No. 98).
-
Check that the fuse is not blowing.
Is the fuse blown (open)?
YES>>Replace the fuse after repairing the applicable circuit.
NO>>Perform the trouble diagnosis for power supply circuit.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY CIRCUIT-II
Check the continuity between electric water pump relay and electric purge pump relay and ground.
| Electric water pump relay and electric purge pump relay | — | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| F103 | 8 | Ground | Existed |
Is the inspection result normal?
YES>>GO TO 9.
NO>>Repair or replace error-detected parts.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP POWER SUPPLY CIRCUIT-III
-
Check the continuity between electric water pump relay and electric purge pump relay and charge air cooler electric water pump harness connector.
Electric water pump relay and electric purge pump relay Charge air cooler electric water pump Continuity Connector Terminal Connector Terminal F103 6 E36 2 Existed -
Also check harness for short to power and short to ground.
Is the inspection result normal?
YES>>GO TO 10.
NO>>Repair or replace error-detected parts.
CHECK ELECTRIC WATER PUMP RELAY AND ELECTRIC PURGE PUMP RELAY
Check electric water pump relay and electric purge pump relay. Refer to Component Inspection.
Is the inspection result normal?
YES>>INSPECTION END
NO>>Replace CAC cooling relay.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP GROUND CIRCUIT
Check the continuity between charge air cooler electric water pump harness connector and ground.
| Charge air cooler electric water pump | — | Continuity | |
|---|---|---|---|
| Connector | Terminal | ||
| E36 | 4 | Ground | Existed |
Is the inspection result normal?
YES>>GO TO 12.
NO>>Repair or replace error-detected parts.
CHECK CHARGE AIR COOLER ELECTRIC WATER PUMP CONTROL CIRCUIT
-
Disconnect ECM harness connector.
-
Check the continuity between ECM harness connector and charge air cooler electric water pump harness connector.
ECM Charge air cooler electric water pump Continuity Connector Terminal Connector Terminal F72 32 E36 3 Existed 39 1 -
Also check harness for short to power and short to ground.
Is the inspection result normal?
YES>>Replace charge air cooler electric water pump. Refer to Removal and Installation.
NO>>Repair or replace error-detected parts.
Other materials:
Basic information
WARNING
Improper loading or overloading of a trailer can negatively impact vehicle handling, braking, and overall performance, increasing the risk of an accident.
CAUTION
Do not tow a trailer or haul heavy loads during the first 500 miles (800 km) of vehicle operation. Doing so may damage the eng ...
Motion-activated liftgate
Basic information
The Nissan Rogue liftgate can be opened using a quick forward kicking motion beneath the center area of the rear bumper.
The kick motion sensor a is located behind the bumper. When your foot moves under and away from the detection area b while carrying the Intelligent Key, ...
Sièges, ceintures de sécurité et systèmes de retenue supplémentaires (SRS)
Dans le Nissan Rogue, la sécurité des occupants repose sur l’association des ceintures, des appuie-tête et des dispositifs SRS (airbags et capteurs). Reportez-vous toujours aux avertissements du manuel avant toute intervention sur un composant SRS.
Airbags avant : protection frontale du ...
