DIAGNOSIS AND REPAIR WORKFLOW
Interview Sheet

Wiring diagram
DTC/circuit diagnosisStarting the engine (models with NISSAN
Intelligent Key® system)
Apply the parking brake.
Move the shift lever to P (Park) or N (Neutral).
P (Park) is recommended.
The starter is designed not to operate if
the shift lever is in any of the driving
positions.
Push the ignition switch to the ON position.
Depress the brake pedal and pus ...
Terms
It is important to familiarize yourself with
the following terms before loading your
vehicle:
Curb Weight (actual weight of your
vehicle) - vehicle weight including:
standard and optional equipment, fluids,
emergency tools, and spare tire
assembly. This weight does not include
...
VDC off indicator lamp
Component Function Check
1.CHECK VDC OFF INDICATOR LAMP FUNCTION (1)
Check that VDC OFF indicator lamp in combination meter turns ON for 1 second
after ignition switch is turned
ON.
CAUTION:
Never start the engine.
Is the inspection result normal?
YES >> GO TO 2.
NO >> Proc ...