Nissan Rogue manuals

Nissan Rogue Owners Manual: Air conditioner operation

Start the engine, turn the fan control dial to the desired position, and press the button to activate the air conditioner. When the air conditioner is on, cooling and dehumidifying functions are added to the heater operation.

The air conditioner cooling function operates only when the engine is running.

Cooling

This mode is used to cool and dehumidify the air.

  1.  Press the air flow control button.
  2.  Turn the fan control dial to the desired position.
  3.  Push the button. The indicator light on the button will come on.
  4.  Turn the temperature control dial to the desired position.

Dehumidified heating

This mode is used to heat and dehumidify the air.

  1.  Press the button to the OFF position.
  2.  Press the air flow control button.
  3.  Turn the fan control dial to the desired position.
  4.  Push the button.
  5.  Turn the temperature control dial to the desired position.

Dehumidified defogging

This mode is used to defog the windows and dehumidify the air.

  1.  Press the air flow control button.
  2.  Turn the fan control dial to the desired position.
  1.  Turn the temperature control dial to the desired position.

Operating tips

Heater operation
Heating This mode is used to direct heated air to the foot outlets. Some air also flows from the defrost outlets and the side vent outlets.  Press the button to change to fresh air i ...

Air flow charts
The following charts show the button and dial positions for MAXIMUM AND QUICK heating, cooling or defrosting. The air recirculation indicator should always be in the OFF position for heating and d ...

Other materials:

Basic inspection
COMPONENT INSPECTION Inspection AFTER A COLLISION WARNING: Inspect all seat belt assemblies including retractors and attaching hardware after any collision. NISSAN/INFINITI recommends that all seat belt assemblies in use during a collision be replaced unless the collision was minor and t ...

Additional service when replacing ECM
Description When replacing ECM, the following procedure must be performed. (For details, refer to EC-136, "Work Procedure".) PROGRAMMING OPERATION NOTE: After replacing with a blank ECM, programming is required to write ECM information. Be sure to follow the procedure to perform t ...

U1000 CAN COMM circuit
Description CAN (Controller Area Network) is a serial communication line for real time application. It is an on-vehicle multiplex communication line with high data communication speed and excellent error detection ability. Many electronic control units are equipped onto a vehicle, and each co ...

© 2014-2021 Copyright www.nirogue.com