Nissan Rogue manuals

Nissan Rogue Service Manual: Power supply and ground circuit

COMBINATION METER

COMBINATION METER : Diagnosis Procedure

Regarding Wiring Diagram information, refer to MWI-32, "Wiring Diagram".

1.CHECK FUSES

Check that the following fuses are not blown.

Check fuses

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2.POWER SUPPLY CIRCUIT CHECK

1. Disconnect combination meter connector.

2. Check voltage between combination meter harness connector M77 terminals 45, 46 and ground.

Power supply circuit check

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connector.

3.GROUND CIRCUIT CHECK

  1.  Turn ignition switch OFF.
  2.  Check continuity between combination meter harness connector and ground.

Ground circuit check

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connector.

BCM (BODY CONTROL SYSTEM) (WITH INTELLIGENT KEY SYSTEM)

BCM (BODY CONTROL SYSTEM) (WITH INTELLIGENT KEY SYSTEM) : Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS-50, "Wiring Diagram".

1. CHECK FUSE

Check that the following fuse is not blown.

Check fuse

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2. CHECK POWER SUPPLY CIRCUIT

  1.  Disconnect BCM connector M20.
  2.  Check voltage between BCM connector M20 and ground.

Check power supply circuit

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connectors.

3. CHECK GROUND CIRCUIT

Check continuity between BCM connector M20 and ground.

Check ground circuit

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connectors.

BCM (BODY CONTROL SYSTEM) (WITHOUT INTELLIGENT KEY SYSTEM)

BCM (BODY CONTROL SYSTEM) (WITHOUT INTELLIGENT KEY SYSTEM) : Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS-110, "Wiring Diagram".

1. CHECK FUSE

Check that the following fuse is not blown.

Is the fuse blown? YES >> Replace the blown fuse after repairing the affected circuit.

NO >> GO TO 2.

2. CHECK POWER SUPPLY CIRCUIT

  1. Disconnect BCM connector M20.
  2. Check voltage between BCM connector M20 and ground.

Check power supply circuit

Is the inspection result normal? YES >> GO TO 3.

NO >> Repair or replace harness or connectors.

3. CHECK GROUND CIRCUIT

Check continuity between BCM connector M20 and ground.

Check ground circuit

Is the inspection result normal? YES >> Inspection End.

NO >> Repair or replace harness or connectors.

DTC/circuit diagnosis
...

Meter buzzer circuit
Description The buzzer for the warning chime system is installed in the combination meter. The combination meter sounds the buzzer based on the signals transmitted from various units. C ...

Other materials:

Valve timing control
Exploded View Valve timing cover 2. O-rings Intake valve timing intermediate lock control solenoid valve  Intake valve timing control solenoid valve  Exhaust valve timing control solenoid valve Intake Valve Timing Intermediate Lock Control Solenoid Valve, Intake ...

Service data and specifications (SDS)
General Specification GENERAL SPECIFICATIONS ( ): Valve timing control “ON” Drive belt Spark Plug Intake Manifold Exhaust Manifold Camshaft *1: Cam wear limit *2: Total indicator reading VALVE LIFTER VALVE CLEARANCE *: Approximately 80°C (176°F) AVAIL ...

P0500 VSS
Description ECM receives vehicle speed signals from two different paths via CAN communication line: One is from the ABS actuator and electric unit (control unit) via the combination unit and the other is from TCM. DTC Description DTC DETECTION LOGIC DTC No. CONSULT screen terms ...

© 2014-2022 Copyright www.nirogue.com