Inspection and Repair
INSPECTION
Test needle will swing abruptly when probe passes the point.
REPAIR
REPAIR EQUIPMENT
REPAIRING PROCEDURE
Shake silver composition container before use.
This check should be conducted 10 minutes after silver composition is deposited.
Do not touch repaired area while test is being conducted.
If a heat gun is not available, let the repaired area dry for 24 hours.
Removal and installation
NATS ANTENNA AMP.
Exploded View
Instrument finisher B
Push button ignition switch
NATS antenna amp.
Pawl
Removal and Installation
REMOVAL
Remove the instrument finisher B. Refer to IP-16, "INSTRUMENT
FINISHER B : Removal and Installation".
Release ...
Sample/Wiring Diagram -Example-
Each section includes wiring diagrams.
Description
Number
Item
Description
1
Power supply
This means the power supply of fusible link or fuse.
2
Fuse
“/” means the fuse.
3
Current rating of fusible
...
P0172 fuel injection system function
DTC Description
DTC DETECTION LOGIC
With the Air/Fuel Mixture Ratio Self-Learning Control, the actual mixture
ratio can be brought closely to the
theoretical mixture ratio based on the mixture ratio feedback signal from the
A/F sensors 1. The ECM calculates
the necessary compensation to corr ...