Nissan Rogue manuals

Nissan Rogue Service Manual: Basic inspection

DIAGNOSIS AND REPAIR WORKFLOW

Work Flow (With EXP-800 NI or GR8-1200 NI)

CHARGING SYSTEM DIAGNOSIS WITH EXP-800 NI OR GR8-1200 NI

To test the charging system, use the following special service tools:

NOTE: Refer to the applicable Instruction Manual for proper charging system diagnosis procedures.

OVERALL SEQUENCE

Overall sequence

DETAILED FLOW

NOTE: To ensure a complete and thorough diagnosis, the battery, stater and generator test segments must be done as a set from start to finish.

1.PRELIMINARY INSPECTION

Perform the preliminary inspection. Refer to CHG-16, "Diagnosis Procedure".

>> GO TO 2.

2.DIAGNOSIS WITH EXP-800 NI OR GR8-1200 NI

Perform the charging system test using Multitasking battery and electrical diagnostic station GR8-1200 NI or Battery and electrical diagnostic analyzer EXP-800 NI. Refer to the applicable Instruction Manual for proper testing procedures.

Test result NO PROBLEMS>>Charging system is normal and will also show “DIODE RIPPLE” test result.

NO VOLTAGE>>GO TO 3.

LOW VOLTAGE>>GO TO 10.

HIGH VOLTAGE>>Replace generator. Refer to CHG-20, "Removal and Installation".

EXCESSIVE RIPPLE, OPEN PHASE, OPEN DIODE or SHORTED DIODE>>Replace the generator. Refer to CHG-20, "Removal and Installation". Perform “DIODE RIPPLE” test again using Multitasking battery and electrical diagnostic station GR8-1200 NI or Battery and electrical diagnostic analyzer EXP-800 NI to confirm repair.

3.INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

Turn the ignition switch ON.

Does the charge warning lamp illuminate? YES >> GO TO 4.

NO >> Replace generator. Refer to CHG-20, "Removal and Installation".

4.INSPECTION WITH CHARGE WARNING LAMP (IDLING)

Start the engine and run it at idle.

Does the charge warning lamp turn OFF? YES >> GO TO 5.

NO >> GO TO 6.

5.INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 3,000 RPM)

Increase and maintain the engine speed at 3,000 rpm.

Does the charge warning lamp remain off? YES >> GO TO 7.

NO >> GO TO 6.

6.INSPECTION OF GENERATOR PULLEY

Check generator pulley. Refer to EM-13, "Checking".

Is generator pulley normal? YES >> Replace generator. Refer to CHG-20, "Removal and Installation".

NO >> Repair as needed.

7.“B” TERMINAL CIRCUIT INSPECTION

Check “B” terminal circuit. Refer to CHG-18, "Diagnosis Procedure".

Is “B” terminal circuit normal? YES >> Replace generator. Refer to CHG-20, "Removal and Installation".

NO >> Repair as needed.

8.“B” TERMINAL CIRCUIT INSPECTION

Check “B” terminal circuit. Refer to CHG-18, "Diagnosis Procedure".

Is “B” terminal circuit normal? YES >> GO TO 9.

NO >> Repair as needed.

9.INSPECTION OF GENERATOR PULLEY

Check generator pulley. Refer to CHG-20, "Removal and Installation".

Is generator pulley normal? YES >> Replace generator. Refer to CHG-20, "Removal and Installation".

NO >> Repair as needed.

Work Flow (Without EXP-800 NI or GR8-1200 NI)

OVERALL SEQUENCE

Before performing a generator test, make sure that the battery is fully charged. A 30-volt voltmeter and suitable test probes are necessary for the test.

Overall sequence

DETAILED FLOW

1.PRELIMINARY INSPECTION

Perform the preliminary inspection. Refer to CHG-16, "Diagnosis Procedure".

>> GO TO 2.

2.INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS TURNED ON)

When ignition switch is turned ON.

Does the charge warning lamp illuminate? YES >> GO TO 3.

NO >> Replace generator. Refer to CHG-20, "Removal and Installation".

3.INSPECTION WITH CHARGE WARNING LAMP (IDLING)

Start the engine and run it at idle Does the charge warning lamp turn OFF? YES >> GO TO 4.

NO >> GO TO 5.

4.INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 2,500 RPM)

Increase and maintain the engine speed at 2,500 rpm.

Does the charge warning lamp illuminate? YES >> GO TO 5.

NO >> Inspection End.

5.MEASURE “B” TERMINAL VOLTAGE

Start engine. With engine running at 2,500 rpm, measure “B” terminal voltage.

What voltage does the measurement result show? Less than 13.0 V>>GO TO 6.

More than 16.0 V>>Replace generator. Refer to CHG-20, "Removal and Installation".

6.“B” TERMINAL CIRCUIT INSPECTION

Check “B” terminal circuit. Refer to CHG-18, "Diagnosis Procedure".

Is the inspection result normal? YES >> Replace generator. Refer to CHG-20, "Removal and Installation".

NO >> Repair as needed.

Wiring diagram
CHARGING SYSTEM Wiring Diagram ...

DTC/circuit diagnosis
...

Other materials:

Preparation
Special Service Tool The actual shapes of the tools may differ from those illustrated here. Tool number (TechMate No.) Tool name Description — (J-39570) Chassis Ear Locating the noise — (J-50397) NISSAN Squeak and Rattle Kit ...

Component parts
Component Parts Location No. Component Function 1 Key switch Transmits the key switch signal to the BCM. Refer to SEC-115, "Component Parts Location" (without Intelligent Key system) for detailed installation location. 2 ...

Map lights
Map lights Push the button to turn the map lights on. To turn them off, press the button again. CAUTIONDo not use for extended periods of time with the engine stopped. This could result in a discharged battery. Personal Lights (if so equipped) Rear personal lights To tu ...

© 2014-2024 Copyright www.nirogue.com